Telluride Lot B Multi-Family Affordable Housing
Start Date: 04/01/2018
Completion Date: 03/07/2020
Overview
Goff provided schematic design consultation, construction documents, and construction administration services for a four–building, 16-unit multi-family affordable housing development on the edge of the Telluride Valley Floor. The consultation and schematic narratives allowed the selected contractor to provide an early “Guaranteed Maximum Price” for an accelerated schedule. Goff then followed with design, construction documents and construction administration for the four distinct buildings. Design elements included a mat foundation to meet the challenges of poor soils, load transfers in the units to accommodate unique floor plans, and tight floor-to-floor tolerances to meet the design requirements of the Valley Floor corridor.