El Rancho Florida Water System
Client: Florida River Estates Metro District
Start Date: 04/01/2016
Completion Date: 12/01/2018
Overview
Goff developed design drawings and administered construction for the replacement of the water distribution system for El Rancho Florida Subdivision. The Project was completed in two phases, with DOLA grant funding. The water distribution system includes approximately 25,000 feet of distribution main and 95 service connections. The design of the replacement system required hydraulic modeling and design improvements, ensuring adequate fire suppression capabilities for the subdivision.